[Home] [Back To Utilities] [System Analysis Form] [Request Form]

COMPLETED PROJECTS

CURRENT PROJECTS

Water

Electric

Gas

Wi-Fi

COMPLETED PROJECTS

1997-2006

2006 - Northglenn, CO

2006 - Danbury, CT

2006 - DeLand, FL

2006 - Crescent City FL

2006 - Atlantic Highlands

2006 - Marion County, FL

2006 - Montclair, NJ

2005 - Fall River MA,

2005  Celebration, Fl

2005 - Kissimmee, FL

2005 - Dutchess County Water & Wastewater, NY

2005 - Wrightstown NJ

2005 -  Rockaway Borough, NJ

2005 -   Ellenville, NY

2003 - 2004  – Lee, Ma - Point of contact: Dave Parker, Superintendent, Town of Lee, MA (413) 243-5520.

2003 - 2004 – Cortlandt, New York - Point of contact: Jeff Wynans, Northern Westchester Joint Water Works, (914) 737-4929

2004 - Orange, New Jersey - Point of contact: Tony Scillia, Garden state Engineering of New Jersey, LLC, (201) 826-8470.

2004 - Rockaway Borough, NJ

2004 - Montclair, New Jersey - Point of contact: Mr. Mike Locascio, Supervisor - (973) 744-4600.

2004 - Maple Shade, NJ - Point of contact: Bill Butler, USFilter, (856) 488-7450. 

2004 - Woodstock, New York - Point of contact: Paul Van Wagenen, Project Engineer, (845) 338-7622.

2004 - Voorheesville, New York - Point of contact: Will Smith, Superintendent, (518) 765-4512.

2004 - East Fishkill, New York  - Point of contact: Ms. Christine Mitchell, (845) 562-3430.

2003 – City of Bordentown, NJ – Supply and installation of  water meters with radio units. The existing water meter system requires the meter reader to access the home to read the meter. The average age of the meters being replaced is 30 years. The new system deployed will improve meter reading productivity and account for water loss due to under- registration through the old meters. Lockouts and estimated readings will be eliminated.  Point of contact:  Don Russo, P.E., BCM Engineers (610) 313-3100.

2003 – Roosevelt, New JerseyInstallation of  water meters in pit settings and installation of 75 complete pits.  The current system is billed on a flat rate with no minimum or maximum usage applied. Once installed the new system will provide 100% accountability to each water customer’s usage. NMS is a subcontractor for SLC Meter East Inc for this project. Point of contact: Joseph Overbeck – (800) 390-8060.

2003 - Sussex, New Jersey – Supply and installation of 1,000 radio read water meters. National Metering Services, Inc. has been sub-contracted by Allied Meter Services, Inc. to install and manage the meter installation project. Allied Meter Services, Inc. will supply all meter and radio related equipment. All meters replaced will be tested at National Metering Services, Inc.’s certified meter testing facility. Point of contact: Mr. Doug Jones, Allied Meter Services, Inc. (609) 387-8083.

2003 – City of Lewistown, PA –  Installation of 6,500  water meters with radio transmitters. The existing water meter system requires the meter reader to access the home to read the meter or read an outside remote. The average age of the meters being replaced is 15 years. The new system once deployed will improve meter reading productivity and account for water loss due to under- registration through the old meters. Lockouts and estimated readings will be eliminated.  Point of contact: Harris Layton, (717) 248-0165.

2003 - Goshen, New York - Installation of 500 water meters with radio transmitters. The new system will improve the accuracy of obtaining meter readings. NMS will provide all project management, labor and material (meters) and customer relations. All meters replaced will be exit  tested at National Metering Services, Inc.’s certified meter testing facility to help identify water and revenue losses from the obsolete meter system. Point of contact: Mr. Joseph Henry - (845) 562-3430.

2002/2003 - Columbia, SC - Supply and installation of 5,000  direct read water meters and backflow valves. All meter are located in meter pits outside the home and will have backflow prevention devices installed at the same time the meter is being replaced. Point of contact: Ted Morgan, Supervisor Columbia Water Department, 803 733-8491.

2003 Rockaway Township, NJ - installation of 6 industrial water meters to be read via radio. Point of contact is Robert Sheard, Water and Sewer Superintendent,  (973) 983-2825. 

2003 - HO-HO-KUS, New Jersey– Installation and retro-fit of 1,500 water meters with radio units to upgrade the borough’s water meter system. This new system will improve productivity and reduce costs related to meter reading and billing.  National Meter is required to do an exit test on all meters being removed. Point of contact: Mr. Mike Franks, Supervisor (201) 445-8161.

2003 - East Fishkill, New York - Installation of 300 remote water meters with meter setter, and dual check valves. This new system will improve the accuracy of obtaining meter readings and reduce lockouts. NMS will provide all project management. Point of contact: Ms. Christine Mitchell. - (845) 562-3430.

2003 – Dover, NY - Dutchess County Water & Wastewater Authority (DCWWA) the operating authority for Dover, NY contracted National Metering Services, Inc. to install water meters with new outside remote water meters and setting equipment on accounts that are not currently metered. Point of contact: Edward Mills III, Project Facilitator (845) 486-3625

2002 - Flemington, New Jersey – Supply and installation of 1,000 remote and radio read water meters. All meters being replaced are to be tested at National Metering Services, Inc.’s certified testing facility. By testing the meters being replaced, the borough will see the percentage of revenue they were losing to old meters and will have a record of the exit test results to use in customer service for high bill complaints.  Point of contact: Ralph Runge, (908) 782-8840.

2002- Ambler, PA  - Installation of 5,500 Radio units to upgrade the borough’s remote water meter system. This new system will improve productivity and reduce costs related to meter reading and billing. NMS will provide all project management, labor and customer relations. Ambler will provide the equipment. Point of contact: William Weir, P.E., (215) 646-1000.

2002 - Town of Reading, MA – Installation of 7,500 radio units. The existing remote water meter system was updated to a mobile drive-by radio read system. National Metering Services, Inc. replaced existing remotes with radio transponders supplied by the town of Reading. The project was complete in 6 weeks. Contract amount: $135,000.00. Point of contact: Mr. David Lee, DPW Business Supervisor, (781) 942-9018.

2002 – Hyde Park, NY - Dutchess County Water & Wastewater Authority (DCWWA) the operating authority for Hyde Park, NY contracted National Metering Services, Inc. to replace all existing water meters with new outside remote water meters and to install new meters and setting equipment on accounts that are not currently metered. Point of contact: Edward Mills III, Project Facilitator (845) 486-3625.

2001- Waynesfield Ohio - Supply & installation of remote water meters and installation of 42-meter pits and appurtenances. Point of contact: Jeffery Puthoff, P.E., Choice One Engineering (937) 497-0200.

2001 - Old Bridge New Jersey, M.U.A. - Supply and installation of  water meters sizes, 5/8 to 6" in both homes and in pits. Supply and installation of radio transmitters on all meters larger than 1" and in all meter pits. Point of contact: Mr. Michael Roy, P.E., Old Bridge MUA (732) 679-8565.

2001- Beachwood New Jersey - Supply & installation of 1,000 remote water meters. Point of contact: David A. Thesing, P.E., P.P., C.M.E., Owen, Little & Associates (732) 244-1090  

2001 - Saddlebrook New Jersey Programming and Installation of  water meters on all commercial accounts. All meters will be read electronically by  radio transponder. All changed meters will be exit tested by National Metering Services, Inc. for accuracy. National Metering Services, Inc. is a sub-contractor on this project for S.L.C. Meter East. Point of contact: Mike Nannini of Boswell Engineering, Project Engineer, (201) 641-0770.

2001- Doylestown PA - Installation of 850 remote water meters. Point of contact: Craig Eaton, Director of Water Operations (215) 345-4140

2001- Brookwood Water Association - Supply and (cut in type) installation of 425 remote water meters. All meters will be read electronically by remote. Point of contact: Joe DeMarco, Director (908) 850-7185

1999 - 2001 Hazelton, Pennsylvania –Installation of 5,000 remote water meters. Point of contact is John Synoski, PE., (570) 455-9407, Schumacher Engineering. 3 Year/3 phase project.

2000 - Warrington Township, Pennsylvania – Installation of 250 water meters  & radio units with remote read back up, installation of back flow valves on all serviced accounts.Certified test of all meters replaced. Point of contact is Frank Corradi, Director. 215-768-6110

1999 - Lyndhurst, New Jersey –Installation of 5,500 water meters sized 5/8” to 8” meters. Certified test of all meters replaced. Point of contact is Dan Kaufman, PE., (201) 939-8805, Neglia Engineering Associates

1999 - Fishkill, New York – Supply and installation of 300 remote water meters. Certified test of all meters replaced.

1999 - Ambler Borough, Ambler PA  – Installation of 500 remote meters. Point of contact Bill Weir, P.E. 215-646-1000

1999 - Spring Lake, New Jersey – Installation and retrofit of 1,800 remote read meters. Certified test of all meters replaced. Point of contact Joe Gemmell, P.E., T&M Associates (732) 671-6400.

1999 - Lakehurst, New Jersey - Supply and installation of 400 water meters with outside remotes. Certified test of all meters replaced. Point of contact Alan Dittenhoffer, P.E., Remington, Vernick & Vena. (732) 286-9220.

1998 - Verona, New Jersey -  Supply and install 350 remote water meters. Point of contact: James Helb (973) 857-4804 Town Engineer.

1998 - Canajoharie, NY - Installation of 830 remote water meters.  Point of contact is Heather Blakely, Project Engineer of Rust Environment and Infrastructure Engineering, (518) 435-7215. 

*1998 - Rockaway Township, NJ - installation of 4300 water meters to be read via  radio.  National Metering Services, Inc. was subcontracted by ABB Water Meters. Certified test of all meters replaced. Point of contact is Robert Sheard, Water and Sewer Superintendent,  (973) 983-2825.

*ABB Water Meters, Inc., P.O. Box 1852, Ocala, Florida 34478.  Point of contact is Thomas Kret, Regional Sales Manager, (800) 874-0890.

1998 - Deptford, NJ - installation of 2200  Outbound Tele-coder water meters to be read via the outbound telephone lines. Point of contact is Ed Deak, superintendent, (609) 848-0200.  

**1998 - Wall Township, NJ - installation of 6500 remote water meters.  National subcontracts for Middlesex Water Company. Certified test of all meters replaced. Point of contact is Jim White, Superintendent Utilities Authority, (732) 449-2700. 

**Middlesex Water Company, 1500 Ronson Road, Iselin, New Jersey.  Point of contact is       Ron Williams, Vice-President of Operations,  (732) 624-1500.

1997 - Garfield, NJ - installation of  550 remote water meters. Point of contact was Mike Nannini of Boswell Engineering, Project Engineer, (201) 641-0770.

1997 - Verona, NJ - installation of  360 remote water meters. Point of contact was James Helb, M.U.A. Engineer, (973) 857-4804. 

1997 - Elizabeth, NJ - installation of 1200 Hershey pulse generated water meters with outside remotes.  NMS was required to do a certified test of all the old water meters we removed.   Point of contact was Ray Zwaryez, Water and Sewer Engineer. 

 CURRENT PROJECTS

[home] [press releases] [search] [contact us] [faqs]

National Metering Services

Corporate Offices and Certified Meter Testing Facility

163 Schuyler Avenue Box 491, Kearny, New Jersey 07032

Toll Free: 1-888-448-0009  Phone: 201-246-1115  Fax: 201-246-1831

find more NMSNJ offices in your area

Copyright © 2006 National Metering Services, Inc. All rights are reserved. 2006. webmaster. www.capturedstudio.com.Last modified: 08/12/06

   

 

counters