COMPLETED PROJECTS
1997-2006
2006 -
Northglenn, CO
2006 -
Danbury, CT
2006 -
DeLand, FL
2006 -
Crescent City FL
2006 -
Atlantic Highlands
2006 -
Marion County, FL
2006 -
Montclair, NJ
2005 -
Fall River MA,
2005
Celebration, Fl,
2005 -
Kissimmee, FL
2005 -
Dutchess County Water
& Wastewater, NY
2005 -
Wrightstown NJ
2005 -
Rockaway
Borough, NJ
2005 -
Ellenville, NY
2003 - 2004 –
Lee, Ma - Point
of contact: Dave Parker, Superintendent, Town of Lee, MA (413) 243-5520.
2003 - 2004 –
Cortlandt,
New York - Point of contact: Jeff Wynans, Northern Westchester
Joint Water Works, (914) 737-4929
2004 -
Orange, New
Jersey - Point of contact: Tony Scillia, Garden state Engineering
of New Jersey, LLC, (201) 826-8470.
2004 -
Rockaway
Borough, NJ
2004 -
Montclair, New Jersey
- Point of
contact: Mr. Mike Locascio, Supervisor - (973) 744-4600.
2004 -
Maple Shade, NJ - Point of contact: Bill
Butler, USFilter, (856) 488-7450.
2004 -
Woodstock, New York - Point of contact: Paul Van Wagenen, Project
Engineer, (845) 338-7622.
2004 -
Voorheesville, New York - Point of contact: Will Smith,
Superintendent, (518) 765-4512.
2004 -
East
Fishkill, New York - Point
of contact: Ms. Christine Mitchell, (845) 562-3430.
2003 – City of
Bordentown, NJ – Supply and
installation of water meters with radio units. The existing water meter
system requires the meter reader to access the home to read the meter. The
average age of the meters being replaced is 30 years. The new system
deployed will improve meter reading productivity and account for water loss
due to under- registration through the old meters. Lockouts and estimated
readings will be eliminated. Point of contact: Don Russo, P.E., BCM
Engineers (610) 313-3100.
2003 – Roosevelt, New Jersey –
Installation of water meters in pit settings and installation of 75
complete pits. The current system is billed on a flat rate with no minimum
or maximum usage applied. Once installed the new system will provide 100%
accountability to each water customer’s usage. NMS is a subcontractor for
SLC Meter East Inc for this project. Point of contact: Joseph Overbeck –
(800) 390-8060.
2003 - Sussex, New Jersey – Supply and
installation of 1,000 radio read water meters. National Metering Services,
Inc. has been sub-contracted by Allied Meter Services, Inc. to install and
manage the meter installation project. Allied Meter Services, Inc. will
supply all meter and radio related equipment. All meters replaced will be
tested at National Metering Services, Inc.’s certified meter testing
facility. Point of contact: Mr. Doug Jones, Allied Meter Services, Inc.
(609) 387-8083.
2003 – City of Lewistown, PA –
Installation of 6,500 water meters with radio transmitters. The existing
water meter system requires the meter reader to access the home to read the
meter or read an outside remote. The average age of the meters being
replaced is 15 years. The new system once deployed will improve meter
reading productivity and account for water loss due to under- registration
through the old meters. Lockouts and estimated readings will be eliminated.
Point of contact: Harris Layton, (717) 248-0165.
2003 - Goshen, New York - Installation
of 500 water meters with radio transmitters. The new system will improve the
accuracy of obtaining meter readings. NMS will provide all project
management, labor and material (meters) and customer relations. All meters
replaced will be exit tested at National Metering Services, Inc.’s
certified meter testing facility to help identify water and revenue losses
from the obsolete meter system. Point of contact: Mr. Joseph Henry - (845)
562-3430.
2002/2003 - Columbia, SC - Supply and
installation of 5,000 direct read water meters and backflow valves. All
meter are located in meter pits outside the home and will have backflow
prevention devices installed at the same time the meter is being replaced.
Point of contact: Ted Morgan, Supervisor Columbia Water Department, 803
733-8491.
2003 Rockaway Township, NJ - installation
of 6 industrial water meters to be read via radio. Point of contact is
Robert Sheard, Water and Sewer Superintendent, (973) 983-2825.
2003 - HO-HO-KUS, New Jersey–
Installation and retro-fit of 1,500 water meters with radio units to upgrade
the borough’s water meter system. This new system will improve productivity
and reduce costs related to meter reading and billing. National Meter is
required to do an exit test on all meters being removed. Point of contact:
Mr. Mike Franks, Supervisor (201) 445-8161.
2003 - East Fishkill, New York -
Installation of 300 remote water meters with meter setter, and dual check
valves. This new system will improve the accuracy of obtaining meter
readings and reduce lockouts. NMS will provide all project management. Point
of contact: Ms. Christine Mitchell. - (845) 562-3430.
2003 – Dover, NY
- Dutchess County Water & Wastewater Authority (DCWWA) the operating
authority for Dover, NY contracted National Metering Services, Inc. to
install water meters with new outside remote water meters and setting
equipment on accounts that are not currently metered. Point of contact:
Edward Mills III, Project Facilitator (845) 486-3625
2002 - Flemington, New Jersey – Supply and installation of
1,000 remote and radio read water meters. All meters being replaced are to
be tested at National Metering Services, Inc.’s certified testing facility.
By testing the meters being replaced, the borough will see the percentage of
revenue they were losing to old meters and will have a record of the exit
test results to use in customer service for high bill complaints. Point of
contact: Ralph Runge, (908) 782-8840.
2002- Ambler, PA - Installation of 5,500 Radio
units to upgrade the borough’s remote water meter system. This new system
will improve productivity and reduce costs related to meter reading and
billing. NMS will provide all project management, labor and customer
relations. Ambler will provide the equipment. Point of contact: William
Weir, P.E., (215) 646-1000.
2002 - Town of Reading, MA –
Installation of 7,500 radio units. The existing remote water meter system
was updated to a mobile drive-by radio read system. National Metering
Services, Inc. replaced existing remotes with radio transponders supplied by
the town of Reading. The project was complete in 6 weeks. Contract amount:
$135,000.00. Point of contact: Mr. David
Lee, DPW Business Supervisor, (781) 942-9018.
2002 – Hyde Park, NY
- Dutchess County Water & Wastewater Authority (DCWWA) the operating
authority for Hyde Park, NY contracted National Metering Services, Inc. to
replace all existing water meters with new outside remote water meters and
to install new meters and setting equipment on accounts that are not
currently metered. Point of contact: Edward Mills III, Project Facilitator
(845) 486-3625.
2001- Waynesfield Ohio
- Supply & installation of remote water meters and installation of 42-meter
pits and appurtenances. Point of contact: Jeffery Puthoff, P.E., Choice One
Engineering (937) 497-0200.
2001 - Old Bridge New
Jersey, M.U.A. - Supply and
installation of water meters sizes, 5/8 to 6" in both homes and in pits.
Supply and installation of radio transmitters on all meters larger than 1"
and in all meter pits. Point of contact: Mr. Michael Roy, P.E., Old Bridge
MUA (732) 679-8565.
2001- Beachwood New
Jersey - Supply & installation of
1,000 remote water meters. Point of contact: David A. Thesing, P.E., P.P.,
C.M.E., Owen, Little & Associates (732) 244-1090
2001 - Saddlebrook New
Jersey – Programming and
Installation of water meters on all commercial accounts. All meters
will be read electronically by radio transponder. All changed meters will
be exit tested by National Metering Services, Inc. for accuracy. National
Metering Services, Inc. is a sub-contractor on this project for S.L.C. Meter
East. Point of contact: Mike Nannini of Boswell Engineering, Project
Engineer, (201) 641-0770.
2001- Doylestown PA
- Installation of 850 remote water meters. Point of contact: Craig Eaton,
Director of Water Operations (215) 345-4140
2001- Brookwood Water
Association - Supply and (cut in
type) installation of 425 remote water meters. All meters will be read
electronically by remote. Point of contact: Joe DeMarco, Director (908)
850-7185
1999 - 2001 Hazelton, Pennsylvania
–Installation of 5,000 remote water meters. Point of contact is John Synoski,
PE., (570) 455-9407, Schumacher Engineering. 3 Year/3 phase project.
2000 - Warrington
Township, Pennsylvania –
Installation of 250 water meters & radio units with remote read back up,
installation of back flow valves on all serviced accounts.Certified test of
all meters replaced. Point of contact is Frank Corradi, Director.
215-768-6110
1999 - Lyndhurst, New Jersey
–Installation of 5,500 water meters sized 5/8” to 8” meters.
Certified test of all meters replaced.
Point of contact is Dan Kaufman, PE., (201) 939-8805, Neglia Engineering
Associates
1999 - Fishkill, New York –
Supply and
installation of 300 remote water meters.
Certified test of all meters replaced.
1999 - Ambler Borough,
Ambler PA
– Installation of 500 remote meters. Point of
contact Bill Weir, P.E. 215-646-1000
1999 - Spring Lake,
New Jersey – Installation and
retrofit of 1,800 remote read meters. Certified test of all meters
replaced. Point of contact Joe Gemmell, P.E., T&M Associates (732) 671-6400.
1999 - Lakehurst, New
Jersey -
Supply and installation of 400 water meters with
outside remotes. Certified test of all meters replaced. Point of contact
Alan Dittenhoffer, P.E., Remington, Vernick & Vena. (732) 286-9220.
1998 - Verona, New
Jersey - Supply and install 350 remote water meters. Point of
contact: James Helb (973) 857-4804 Town Engineer.
1998 - Canajoharie, NY
- Installation of 830 remote water meters. Point of contact is Heather
Blakely, Project Engineer of Rust Environment and Infrastructure
Engineering, (518) 435-7215.
*1998 -
Rockaway Township, NJ
- installation of 4300 water meters to be read via radio. National
Metering Services, Inc. was subcontracted by ABB Water Meters. Certified
test of all meters replaced. Point of contact is Robert Sheard, Water and
Sewer Superintendent, (973) 983-2825.
*ABB Water Meters, Inc.,
P.O. Box 1852, Ocala, Florida 34478. Point of contact is Thomas Kret,
Regional Sales Manager, (800) 874-0890.
1998 - Deptford, NJ
- installation of 2200 Outbound
Tele-coder water meters to be read via the outbound telephone lines. Point
of contact is Ed Deak, superintendent, (609) 848-0200.
**1998 -
Wall Township, NJ
- installation of 6500 remote water meters. National subcontracts for
Middlesex Water Company. Certified test of all meters replaced. Point of
contact is Jim White, Superintendent Utilities Authority, (732) 449-2700.
**Middlesex Water Company,
1500 Ronson Road, Iselin, New Jersey. Point of contact is Ron
Williams, Vice-President of Operations, (732) 624-1500.
1997 - Garfield, NJ
- installation of 550 remote water meters. Point of contact was Mike
Nannini of Boswell Engineering, Project Engineer, (201) 641-0770.
1997 - Verona, NJ
- installation of 360 remote water meters. Point of contact was James Helb,
M.U.A. Engineer, (973) 857-4804.
1997 - Elizabeth, NJ
- installation of 1200 Hershey pulse generated water meters with outside
remotes. NMS was required to do a certified test of all the old water
meters we removed. Point of contact was Ray Zwaryez, Water and Sewer
Engineer.
CURRENT PROJECTS |